Monday, July 13, 2009

Reminder of Park Road Closures and Delays

Milepost 269.8 - 280.9 - Blowing Rock Area

Roadway fill repair at Milepost 270.3 will close the Parkway until November, 2009.

For southbound traffic, exit the Parkway at Phillips Gap (Milepost 269.8) to Phillips Gap Road (NC 1168) to Idlewild Road (NC 1003) to US 221 south to US 421 south back to the Parkway at Deep Gap (Milepost 276.4).

For northbound traffic, exit the Parkway at Parkway School (Milepost 280.9) to Old US 421 south to New US 421 south to US 221 north to Idlewild Road (NC 1003) to Phillips Gap Road (NC 1168) back to the Parkway at Phillips Gap (Milepost 269.8).

Milepost 285.5 to 291.8 – Blowing Rock Area

Goshen Creek Bridge repair has closed the Parkway between US Route 421 east of Boone, NC and US Route 321 south of Boone. The detour will begin for visitors traveling south at milepost 285.5, Bamboo Gap. Visitors will follow state road (SR) 1514 Bamboo Road to Deerfield Road, following the detour signs along US Route 321 south of Boone then connecting back to the Parkway at milepost 291.8.

Visitors traveling north will begin the detour at milepost 291.8, intersection US Route 321; follow the detour signs along US321 to state route 1514 Deerfield Road to Bamboo Road which will bring them back to the Parkway at milepost 285.5. The total detour is estimated to be approximately 8 miles.

Bridge repair is anticipated to be complete by late summer or early fall 2009.

Other construction areas to be aware of...

Some short construction delays of 10-15 minutes or one-lane traffic may occur at the following areas during the summer...Milepost 359-375 north of Asheville, and Milepost 401 near Mount Pisgah. Some old pavement in this area is rather rough so bikers beware!

No comments:

Post a Comment